Infrastructure Projects -- continued

Vacuum Pump System

 

Owner:                         Textron Lycoming, Inc.

Contract Amount:         $1,114,370.00

 

Project Description: Design-Build new 2,500 hp, 48" Nash vacuum pump system. Installing control system with 24" solenoid valves.  System to be utilized to test jet  turbine engines.

 


 
 

Repair Sluice Gate/Operators, Dry Dock #3, U.S. Navy, Philadelphia, PA

 

Owner:

Contract Amount:            $998,280.00

                                   

Project Description: Sluice gate, tank, underwater construction, structural steel repairs, repair/replace 54" diameter dry dock valves and operators, clean out dry dock passages of all lead shot and debris.  Additional repairs were performed to each docks Westinghouse de-watering pumps.

 


 

Renovation to AEGIS Tower, Wallops Island, VA

 

Owner:                            U.S. Navy

Contract Amount:            $794,300.00

 

Project Description:  Modifications to 200 ft. structural steel tower.  Added welded steel equipment platforms for electronics/equipment.  Installed fiberglass grating and railings.  Installed steel safety ladders with cage and fall arresting gear.  Sandblasted entire 200 ft. tall structure to near-white (SSP-10) coated with zinc rich prime, epoxy and polyurethane top coat.

 


Blanket Pump Monitoring Subcontract, Radford AAP, Radford, VA

 

Owner:                         Alliant TechSystems

Contract Amount:         $790,000.00

 

Project Description:  Maintain two (2) diesel driven, 800 GPM stainless steel pumps for the pumping of acid waste with nitrocellulose and sulfuric acid waste.  24 x 7 operations.  Project started in August 2005 and continues to present.

 


 

Install New Concrete Blast Pits in SOTF, Ft. Bragg, NC

 

Owner:                       U.S. Army Corps of Engineers

Contract Amount:       $747,000.00

 

Project Description:  Install new 4,000 PSI concrete footings and new 6,000 PSI concrete walls with steel beams and pressure treated timbers for artillery and incendiary devices.



 
 

Miscellaneous Mechanical Repairs, Fort Bragg, NC

 

Owner:                        U.S. Army Corps of Engineers, Savannah District

Contract Amount:         $682,900.00

Contact:                       Alan Hand, ACO

                                    (910) 396-1211 ext. 248

 

Project Description: Cleaning 6,000 lf of 24" sewer lines and sliplining designated 18" - 30" sewer lines with HDPE pipe.  Also video checking all sewer lines.  Modify 16 industrial oil/water separators to meet EPA standards.

 


Renovation of Existing Trails

Cradle of Forestry in America, Pisgah National Forest, Asheville, NC

 

Owner:                        U.S. Department of Agriculture

Contract Amount:         $604,886.31

Contact:                       Steve Cole, COR

                                    (828) 257-4238

 

Project Description: Remove and replace 3,000 lf asphalt hiking trails in remote mountain forest, overlay 2,000 lf same, new water and electrical distribution, patterned concrete aprons, 1,500 lf natural stone walls, landscaping, and site furnishings.

 


Reconstruction of Camping Sites

Cheoah Point Campground, NC

 

Owner:                         U.S. Dept. of Agriculture

Contract Amount:         $554,853.85

Contact:                       Mark Miller

                                    (803) 561-4020

 

Project Description:  This project is the sixth task order issued under an IDIQ contract with the USDA.  The project consisted of reconstructing and adding camping sites on Lake Santeetlah Lake in western North Carolina.

 

Install erosion control to prevent runoff to lake, clear and grub wooded areas, grade existing roads and paths to be ADA compliant, bring in 4,000 cy fill, 500 tons #57 stone; 2 new prefabricated 900 sf log cabins with standing seam roofs; 1,500 lf electrical distribution system; storm water catch basins and culverts; 7,500 sf retaining walls of manufactured stone, 13 new campsites with timber curbing, picnic tables, fire rings, grills, bear-proof garbage receptacles; cedar split rail fence; 1,000 sy asphalt parking areas, asphalt loop road, recondition stone roads, site restoration.


 

Arm/Dearm Pads Site 05 (M&C), Pope AFB, NC

 

Owner:                         US Air Force, Pope AFB, NC

Contract Amount:         $553,400.00

Contact:                       John Howard, Contracting Officer

                                    (910) 394-6257

 

Project Description: Excavate 8,000 cy to grade site; new storm drainage; 2,000 tons aggregate base for paving; 1300 cubic yards of flexural concrete paving; 1,600 tons asphalt paving;  new electric distribution and taxiway lighting; remove and replace joint sealer.  Avino was cited for overall excellence on this project by the U.S. Air Force.

 


 

Phase 2 - Replace Waterlines, Radford Army Ammunition Plant, Radford, VA

 

Owner:                         US Department of Army

Contract Amount:         $552,400.00

Contact:                       Guy Rhodes

                                    Department of the Army

                                    (540)-639-7656

 

Project Description:  Supply and install approximately 3,000 L.F. of new 3" through 14" ductile iron pipe, fittings valves and restraint system for Alliant Technology System. Work is for the new process water, fire water and filtered water.  The job includes installation of a new cathodic protection system.

 


 

MTW Line Replacement, SUNY Morrisville, Morrisville, NY

 

Owner:                        State University Construction Fund

Contract Amount:         $545,722.56

Contact:                       Rob Whalen

                                    (315) 684-6068

 

Project Description:  Project is to replace leaking underground heating and hot water lines on the college campus during 10-week summer break.  Install direct-bury, prefabricated conduit piping system:  total of 1,300 1f each of 8” welded steel High Temperature Hot Water supply and return; and 1,300 1f each of 4” brazed copper Domestic Hot Water piping.  Piping is buried at 4’ – 6’.  Make piping and valve connections in crawl space in boiler room.  Remove and replace welded steel piping, valves and fittings in 3 manholes.  Demolish and restore asphalt roadway, curb and sidewalk.

 


Process Piping & Equipment Installation at NC Bldg. 3507, Radford, VA

 

Owner:                        Alliant TechSystems

Contract Amount:        $515,271.00

Contact:                      David Seese

                                   (540) 639-7634

 

Project Description:  Supply and install new stainless pipe and fittings and valves.  Install roll compressor and centrifuge equipment for manufacturing explosives.  Stainless steel tanks, material handing equipment, control valves.  New coated standard steel frame chlorinated rubber coated steel siding, steel roof, steel explosion proof doors.

 


 
 

Miscellaneous Civil Projects, Fort Bragg, NC

 

Owner:                        Department of the Army

Contract Amount:         $506,310.00

Contact:                        Bill Dotson

                                    (910) 396-1211 ext. 228

 

Project Description: Clean and video inspect 6,000 lf of 12" - 18" sanitary sewer lines; slipline 4,000 lf 8" - 18" lines, replace 1,800 lf 18" sanitary sewer, 100 lf bore under rail road tracks, re-line 18 manholes.

 


 